Warning: unpack() [function.unpack]: Type I: not enough input, need 4, have 0 in /data/wwwroot/www.shledo.com/_code/lib/qeephp/library/cache/file.php on line 188

Warning: file_put_contents() [function.file-put-contents]: Only 0 of 10274 bytes written, possibly out of free disk space in /data/wwwroot/www.shledo.com/_code/lib/qeephp/library/cache/file.php on line 144

Warning: unpack() [function.unpack]: Type I: not enough input, need 4, have 0 in /data/wwwroot/www.shledo.com/_code/lib/qeephp/library/cache/file.php on line 188

Warning: file_put_contents() [function.file-put-contents]: Only 0 of 100 bytes written, possibly out of free disk space in /data/wwwroot/www.shledo.com/_code/lib/qeephp/library/cache/file.php on line 144

Warning: unpack() [function.unpack]: Type I: not enough input, need 4, have 0 in /data/wwwroot/www.shledo.com/_code/lib/qeephp/library/cache/file.php on line 188

Warning: file_put_contents() [function.file-put-contents]: Only 0 of 2005 bytes written, possibly out of free disk space in /data/wwwroot/www.shledo.com/_code/lib/qeephp/library/cache/file.php on line 144
莱多埋地式雨水收集工艺

民泰银行前广场绿地工程

施工时间:2017年11月

民泰银行前广场绿地工程

    该项目地处浙江省温岭市,统计温岭市多年降雨数据得温岭市年均降雨量1649.6mm,夏季雨量较大。本工程为温岭市箬横镇民泰银行银行前广场绿地工程,主要内容为绿化苗木、景观铺装、排水、景观电气及室外给水。

    该项目雨水收集回用工艺,前期采用截污、弃流、过滤的预处理方法,后储存于PP模块蓄水池中,该工艺流程所用模块上方禁止过大型车辆,后期采用全自动自清洗过滤器、紫外线消毒器的处理工艺。该工艺适用于将雨水处理回用于绿化浇灌等。

我想进一步了解我想进一步了解 返回列表


新浪微博
微信

上海市浦东新区川沙路4198号
电话:(+86)021-50431766
传真:(+86)021-58373296
E-mail:ledo@shledo.com

COPYRIGHT © 上海莱多实业有限公司 All rights reserved.
COPYRIGHT © 上海莱多实业有限公司 All rights reserved. 沪ICP备13026806号-1   土木在线 中国建筑科学研究院 绿建之窗